Adrian M. Akins Orange Park, FL 32065 (912) 844-9328 · a_akins@hotmail.com SUMMARYI have 8+ years of total experience in the fields
of: Project Management, Shipbuilding (new construction and repair), Planning
and Scheduling, Cost Control and Estimating, Oil and Gas, Critical Path
Analysis, Root Cause Analysis (5 Why), Initial Baseline Review, Earned Value,
Organizational Breakdown Structure, Work Breakdown Structure, Enterprise
Resource Planning, Capacity Planning of Multi-Contract/Multi-Class ships,
Primavera (P3 & P6), MS Project, Instantis Enterprise Track, Trials, and
Baseline Key Count Schedules which included what if studies near and long
term. EDUCATIONB.S., Mechanical Engineering Technology, December 2003 Savannah State University, Savannah,
Georgia Dean’s List student with 3.0
cumulative GPA and 3.22 GPA [Major] Refrigeration &Air Conditioning, Diploma Program, June 2005 Savannah Technical College, Savannah,
Georgia Chancellor’s & Dean’s List
student with 3.84 GPA
CERTIFICATIONSMicrosoft Excel 2010 Certified, January 2015,
Microsoft Project 2010 Certified, June 2014, Primavera P6 Application
Administration Rel. 8x Certified, March 2014, Primavera P6 version 8.2
Certified, September 2012, Primavera P3 version 5 Certified, October 2008,
Radiation Safety & Nuclear Gauge Certified, July 2006, Hazmat &
Security Awareness Training Certified, July 2006, ACI Concrete Field Testing
Technician-Grade 1 Certified, August 2006, EPA Approved, Air-Conditioning & Refrigeration Institute (ARI) Technician TYPE UNIVERSAL Certified,
October 2004 SKILLSPrimavera P6 Administrator, Primavera P6 version
8.3, Primavera P6 version 8.2, Primavera P3 version 5, MS Project, Instantis
Enterprise Track, Steelray Project Management Software , Deltek Cobra 4.7.75,
Cognos Reporting, AutoCAD, Winship, FORTRAN, C++, Microsoft office (Word,
Excel, PowerPoint, Access), and some Pro Engineering (ProE) EXPERIENCE 05/2014-04/2016Johnson &
Johnson Vision Care, Inc.Jacksonville, Florida Project & Portfolio Engineer
/ Sr. Scheduler ·
Utilized Instantis Enterprise Track, MS Project, & MS
Excel to develop an active and live Project and Portfolio management process
within the Vision Care MAKE Engineering team; Implemented a process to
maintain Instantis Enterprise Track as a live working process with updated
resource and prioritization data ·
Created, managed, tracked, and reported on strategies,
projects, portfolios, processes, resources, and results ·
Gathered the appropriate information and data that allowed
an improved level of performance across the entire MAKE Engineering team ·
Tracked all MAKE Engineering Resources, Priority
Projects/Activities, Associated Resource loadings, and all other appropriate
information to do a Full Resource Analysis and Effectiveness Understanding
across MAKE Engineering ·
Delivered Earned Value Management (EVM) analysis metrics
reports, graphs and dashboards primarily utilizing Instantis Enterprise
Track, Microsoft Project, and Excel ·
Supported the development of an automated Resource,
Capacity Planning, and Project Management initiative which provided the MAKE
Engineering Management Team with advanced analysis across six major project
categories: Capacity, Compliance, NPI, Operations Support,
Quality, & Safety 12/2013-05/2014Avatar
Technologies, Inc. Kennedy Space Center, Florida Sr. Project Scheduler ·
Developed and analyzed detailed schedules for assigned
projects. In addition, generated Enterprise Project Structure (EPS),
Organizational Breakdown Structure (OBS), and Work Breakdown Structure (WBS) ·
Assumed role of P6 Administrator; In this role I
created, assigned, managed, and maintained both global and project security
profiles ·
Incorporated and organized all projects into an Integrated
Master Schedule (IMS) ·
Coordinated and compiled projects from development through
implementation; interacts closely with internal and external clients ·
Constructed and sustained customized project cost and
schedule tracking, trending and Critical Path, Risk, and Earned Value
Management (EVM) analysis metrics reports, graphs and dashboards primarily
utilizing Primavera P6 web and P6 client 07/2012-11/2013Technip USA,
Inc.Theodore, Alabama Sr. Project Scheduling
Consultant ·
Introduced initial master production plan and schedule
that was fully integrated and resource loaded ·
Organized working meetings with Production Manager,
Project Managers and Operation Coordinators to capture detailed statements of
work, forecast resources and budget allocations needed to execute
projects. This includes Initial Baseline Review (IBR) ·
Had an understanding /knowledge of Earned Value Management
System (EVMS), Enterprise Resource Planning (ERP), Critical Path Management
(CPM) scheduling, and Work Breakdown Structures (WBS) ·
Collected weekly status and provided analysis to
Production Manager, Project Managers and Houston Planning Group ·
Interacted closely with all levels of management and
effectively communicated in verbal and written form 08/2011-07/2012BAE Systems
Southeast ShipyardsJacksonville, Florida Project Scheduler III ·
Utilized Steelray Project Management Software to analyze
project schedules for quality and performance. This analysis included
the Defense Contract Management Agency (DCMA) 14 Point Assessment ·
Prepared master production plans and schedules that were
fully integrated and resource loaded ·
Organized working meetings with Project Managers and
Trades to capture detailed statements of work, forecast resources and budget
allocations needed to execute projects. This included Initial Baseline
Review (IBR) and Work Breakdown Structure (WBS) ·
Showcased an understanding /knowledge of Earned Value
Management System (EVMS) and Critical Path Management (CPM) scheduling ·
Earned Value Management reporting on project status
including schedule performance and cost performance index ·
Prepared and updated Critical Path Method (CPM) networks
for ship repair of commercial vessels and other industrial projects
undertaken ·
Collected weekly status and provided analysis to Project
Managers ·
Assessed progress against established plans and budgets
and provided corrective action plans to address deviations from baseline ·
Proactively supported the Project Management Team. ·
Interacted closely with all levels of management and
effectively communicated in verbal and written form 11/2009-08/2011Austal USAMobile,
Alabama Lead Structural Planner & Scheduler ·
Worked closely with production and engineering to provide
design input ·
Assisted in development of detailed build strategies
alongside engineering & production as it pertains to unit assembly and
hull construction in accordance with contract specifications and drawings ·
Identified and sequenced all structural activities in
accordance with established build strategies ·
Established budgets and resource requirements based on
industry standards for all unit assembly and hull construction activities ·
Created Work Breakdown Structure (WBS), detailed work
packages, distributed to production for implementation and monitored
progress ·
Identified long-lead time material requirements in
accordance with established plan and schedule ·
Worked closely with production supervisory personnel to
coordinate daily activities and the flow of interim products and materials in
a dynamic environment to ensure smooth and efficient construction in
accordance with detailed plans and schedules ·
Assessed progress against established plans and budgets
and provided corrective action plans to address deviations from baseline 02/2008-10/2009Tampa Bay
Shipbuilding & RepairTampa, Florida Project Scheduler ·
Worked closely with production and engineering to provide
design input ·
Assisted in development of detailed build strategies
alongside engineering & production as it pertains to unit assembly and
hull construction in accordance with contract specifications and drawings ·
Identified and sequenced all structural activities in
accordance with established build strategies ·
Established budgets and resource requirements based on
industry standards for all unit assembly and hull construction activities ·
Identified long-lead time material requirements in
accordance with established plan and schedule ·
Created Work Breakdown Structure (WBS), detailed work
packages, distributed to production for implementation and monitors
progress ·
Worked closely with production supervisory personnel to
coordinate daily activities and the flow of interim products and materials in
a dynamic environment to ensure smooth and efficient construction in
accordance with detailed plans and schedules ·
Assessed progress against established plans and budgets
and provided corrective action plans to address deviations from baseline ·
Reported progress, schedule, and resource-loading
projections to program team and production supervision ·
Provided input from reports to upper management for
effective & efficient decision-making ·
Determined and reviewed work flow, cash flow, and cost
analysis for the manufacturing division’s influx of material, products, and
supplies |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|